This post was contributed by a community member. The views expressed here are the author's own.

Politics & Government

California Oaks Road Closure

Notice of Full Road Closure
Weekend of 6/1/12  

Granite Construction Company has been contracted to widen California Oaks Road beneath Interstate 15 as well as construct new loop on-ramps.  One of the final stages of work involves the following roadway re-construction:           

-  California Oaks Road – Full Width of Roadway from SB I-15 On-Ramp to NB I-15 On-Ramp (Underneath I-15)  The work to be performed includes the removal of existing roadway, lowering and widening of roadway, placement of roadway base and asphalt, and the opening of new SB/NB loop on-ramps.  This work is currently scheduled to start on Friday 6/1/12 at 10pm and will be completed by the following Monday morning, 6/4/12 at 5am.  California Oaks Road under I-15 will be closed during these working hours.  Freeway ramps will remain open.  Signage will be placed along California Oaks Road directing traffic through a detour. 

Murrieta city officials ask the following:  

1. Be aware of the upcoming closure and please plan your weekend to avoid this work area if possible.  
2. Please follow the detour signage.  
3. **Be cautious when the road is re-opened.**  The traffic configuration (# of lanes, width of road) will have changed. 

City officials say: We regret any inconvenience that this work may cause you, and we thank you for your cooperation in advance for assisting us in improving your freeway access and reducing congestion. Should you have any questions, please contact City Hall at (951) 304-CITY (2489).

We’ve removed the ability to reply as we work to make improvements. Learn more here

The views expressed in this post are the author's own. Want to post on Patch?